从北部兀兰衔接到滨海湾新市区的汤申地铁线(Thomson Line)全长30公里线路及22个站点已确定。包括珠光大厦在内的四个地段将被征用。

有人买了珠光大厦的产业吗?

SINGAPORE: Singapore's sixth rail network -- the Thomson Line (TSL) -- will open from 2019, instead of the indicative timeline of 2018 announced in the Land Transport Master Plan.

Minister for Transport Lui Tuck Yew, who gave an update on the Thomson Line on Wednesday, said the change in timeline is to accommodate some adjustments made to the original plan.

Under the final rail alignment plan of the Land Transport Authority (LTA), the TSL will be longer and have more stations.

It will be 30 kilometres long -- 3 kilometres longer than envisaged -- and have 22 stations, four more than originally planned.

One of them is Springleaf station, sited in Nee Soon Group Representation Constituency (GRC).

Ms Lee Bee Wah, an MP for the area, said: "Springleaf, most of the residents there, they are living in the private estate, landed properties, as well as some condominiums. So this station will be able to serve all these residents."

Another two stations are Woodlands North and South in Sembawang GRC.

Ms Ellen Lee, an MP for the area, said: "It will facilitate transfer, especially within the estate itself and it will solve that crunch that my residents feel."

TSL will run from Woodlands in the north to Marina Bay in the south and is expected to be built at an estimated cost of around S$18 billion.

It is expected to have a daily ridership of 400,000 commuters.

Six of the 22 stations will be interchanges, enabling commuters to reach their destinations in the shortest possible time.

For example, a resident of Sin Ming travelling to Republic Polytechnic in Woodlands will halve his or her commute time from 50 minutes to 25 minutes.

Another at Woodlands Regional Centre heading to Marina Barrage will take 55 minutes instead of 70.

With six interchange stations, the TSL will connect to all existing lines and the future Downtown Line (DTL).

TSL will connect to the North-South Line at Woodlands and Orchard stations.

Caldecott Station will connect to the Circle Line.

Residents of the Bukit Timah stretch can change trains at the future DTL Stevens Station to connect to the TSL.

The Outram Park Station will connect the TSL to the East-West Line and North-East Line, while the Marina Bay Station will connect the TSL to the North-South Line and Circle Line.

TSL will open in three stages from the north to the south.

Phase One, which will have three stations from Woodlands North to Woodlands South, will open in 2019.

Phase Two will be ready in 2020, with stations from Springleaf to Caldecott.

The final stretch of 13 stations from Mount Pleasant to Gardens by the Bay will open in 2021.

When fully operational, an estimated 60,000 households will be within 400 metres of one of the TSL stations.

The line, which will be fully underground, will run on a four-car instead of a three-car system.

Mr Lui said this will give it additional capacity to cope with any increase in long-term demand.

He was speaking during a visit to Telok Ayer Station of Downtown Line One, which will open by the end of next year.

Mr Lui also said: "During the construction phase (of the TSL), there will inevitably be a certain amount of inconvenience, noise pollution. We will try our best to minimise this as much as possible. We will of course want to engage the residents, dialogue with them, find ways to meet as much as possible some of the points that they raise."

LTA, Singapore Land Authority (SLA) and the Urban Redevelopment Authority (URA) said in a joint statement that while all efforts have been made to minimise land acquisition, the government will acquire four full lots.

They include Pearl's Centre in Eu Tong Sen Street, a post office along Upper Thomson Road and two landed properties along Stevens Road and Robin Close.

Pearl's Centre will be affected by the construction of the TSL as a tunnel will run under part of the building.

To optimise land use around the future TSL station at Outram Park, Pearl's Centre will be acquired and integrated with the adjoining state land for a high-density mixed-use development.

Five other part lots will also be acquired but will not affect the main building structure.

The SLA gazetted the land affected by acquisition on Wednesday.
发表于 29-8-2012 15:25:04|来自:美国 | 显示全部楼层
小狮租房
政府征用怎么赔?
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:27:19|来自:美国 来自手机 | 显示全部楼层
  (联合早报网讯)从北部兀兰衔接到滨海湾新市区的汤申地铁线(Thomson Line)预计将耗资180亿元建造,全长30公里,总共将设有22个地铁站。

  联合早报李静仪报道,由于它不论是长度和地铁站数量都比原先计划的来得多,加上采用客运量较高的四节车厢列车设计,通车时间将延后一年至2019年之后、分三个阶段启用,全线预计2021年建好。

  配合这项工程,政府四块地段,包括位于牛车水一带的珠光大厦、汤申路上段的邮政局及史蒂芬路和罗斌弄的两栋洋房。

  珠光大厦的商店业主和住户有两年的时间搬迁,过后这座有43年历史的建筑将拆除,与周围的国有土地结合重新发展为高密度的综合性发展项目。

点评

那个一年卖保险赚22万的NTU大学生有赚翻了,他今年2月买的珠光大厦,72万。  详情 回复 发表于 29-8-2012 16:23
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:27:24|来自:美国 | 显示全部楼层
这个200米里面不是要有3个地铁站?
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:28:20|来自:美国 来自手机 | 显示全部楼层
goldenstar 发表于 29-8-2012 15:25
政府征用怎么赔?

也想知道
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:29:12|来自:美国 | 显示全部楼层
商户赔不好或许会吃亏吧。
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:30:45|来自:美国 来自手机 | 显示全部楼层
goldenstar 发表于 29-8-2012 15:27
这个200米里面不是要有3个地铁站?

是3公里2个站
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:33:38|来自:美国 | 显示全部楼层
铜牌推广者 发表于 29-8-2012 15:30
是3公里2个站

那个是thomson line 2站间距3公里。

牛车水站和outram park没多远,现在中间又多个地铁站。分别不同线的。
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:34:07|来自:美国 来自手机 | 显示全部楼层
靠近康生医院的马里是他路头的那边会被占用吗?
回复 支持 反对

使用道具 举报

发表于 29-8-2012 15:39:35|来自:美国 | 显示全部楼层
同学们有木有详细点的站点图?
回复 支持 反对

使用道具 举报

发表回复

您需要登录后才可以回帖 登录 | 注册会员 新浪微博登陆

本版积分规则

联系客服 关注微信 下载APP 小程序 返回顶部 返回列表